Every gram of material you take out of the manufacturing process, out of each assembly process, has a massive multiplier effect in terms of material reduction.
The only way we can do this effectively is by analysing the process.For example, the size and quantity of raw materials needed to produce the required volume of product will determine the size of the warehouse.
The maximum throughput of the equipment that is used will determine how many pieces of equipment are needed to process the volume.The degree of process automation will determine how many human operatives will be needed along with the associated offices, meeting rooms, tea points and toilets.Every aspect of the process can be used to inform facility design.. Clients will often approach us with a pre-determined idea of what their project should look like.
There is a lot of value in this because the client holds all the technical expertise about their process- more than we ever will.A client’s proposed solution will probably already be well aligned with their engineering requirements but it will also be just one of many possible solutions and our job is not to settle for the adequate outcome but to find the best.. DIGITAL SIMULATION DELIVERS THE BEST PERFORMING DESIGN SOLUTION.
This is another area where data analytics can help the construction industry.
Many aspects of a process can be considered a variable.European Commission (2021) JRC Science for Policy Report:.
Technical assessment of nuclear energy with respect to the ‘do no significant harm’ criteria of Regulation (EU) 2020/852.Ibid.. Ibid.. Ibid.. https://ourworldindata.org/safest-sources-of-energy.
For more information about the proposed strategy, see:.Repurposing Coal: how a P-DfMA approach will help coal-fired power stations fight climate change.